News 2012

21.12.2012
Due to a power outage, most jobs running on Abacus4 have been terminated.

28.06.2012
When a job is submitted on Soroban it is now mandatory to specify how much memory will be required.

18.06.2012
The maximum run-time for jobs on Soroban has now been restricted to 14 days.

28.11.2012
Due to software maintenance it will not be possible to log on to Soroban in the time 08:00-11:00 on Wednesday, 5th December 2012.

19.11.2012
The file system /scratch2 on Abacus4 has failed.

05.10.2012
Normal operation has been resumed on Soroban.

05.10.2012
Soroban will be offline today, probably until 8 p.m. .

04.10.2012
Currently it is not possible to log into Soroban.

05.10.2012
Preparations for shutting down Soroban are being made. Currently new jobs cannot be started.

02.10.2012
Due to problems with the administration servers, access to Soroban may be interupted.

04.07.2012
Normal operation has been resumed on Soroban.

29.07.2012
Because of maintenance on 02-03.07.2012, currently no new jobs will be started on Soroban.

08.05.2012
The maximum run-time for jobs on Soroban has now been restricted to 21 days.

18.04.2012
Normal operation has been resumed on Soroban.

12.04.2012
Start of new jobs has been disabled until maintainance of /scratch is done.

20.03.2012
The maximum run-time for jobs on Soroban has now been restricted to 30 days.

17.02.2012
Normal operation has been resumed on Soroban.

07.02.2012
Soroban is back online, but further disturbances may occur.

07.02.2012
Due to technical issues Soroban is currently offline.

04.01.2012
MATLAB 2011b has been installed on Soroban .

04.01.2012
Normal operation has been resumed on Soroban.